Nanchang Mineral Systems is an excellent global manufacturer of high-end crushing and screening equipment systems and a full-industry chain operator of general contracting for mine processing. It is established in South Africa, Malaysia, Russia, Australia and India. Overseas branches and end users are found in mining, hydropower, nuclear power, stone, building materials, chemical industry and other industries home and abroad.

Home > Project > Crushing Project for Xinjiang Hami Iron Ore Comprehensive Beneficiation Plant

Crushing Project for Xinjiang Hami Iron Ore Comprehensive Beneficiation Plant

2024.09.05

The crushing project for the iron ore comprehensive beneficiation plant, which started production in 2023, is located in Hami City, Xinjiang.

The project handles iron ore that has high compressive strength and hardness, with abundant titanium content. To ensure the project’s output and product quality, after extensive comparison, the client chose Nanchang Mineral Systems Co., Ltd. (hereinafter to as “NMS”)’s 1 GC gyratory crusher, 2 MC multi-cylinder cone crushers, and 3 HPF grizzly feeders. The raw material is first processed by the gyratory crusher and grizzly feeders, and then undergoes primary and secondary crushing in the cone crushers. The resulting 0-50mm iron ore serves as the main raw material for surrounding iron ore processing plants.

The coarse crushing stage of the project utilizes NMS’s GC gyratory crusher, with an installed power of 400kW. The crusher features an integrated design for the main shaft and moving cone, with an arched beam design that increases the feed opening by 14%. The equipment is equipped with the AUTO-RUN automation control system, maximizing production efficiency while minimizing operational challenges and maintenance costs. The high-flow dual-channel lubrication system ensures stable operation, and imported sensors support automatic lubrication, ensuring stability and reliability. Additionally, the frame is designed for easy disassembly and assembly.