Project

Nanchang Mineral Systems is an excellent global manufacturer of high-end crushing and screening equipment systems and a full-industry chain operator of general contracting for mine processing. It is established in South Africa, Malaysia, Russia, Australia and India. Overseas branches and end users are found in mining, hydropower, nuclear power, stone, building materials, chemical industry and other industries home and abroad.

Home > Project > Blyvoor Gold Mine Project in South Africa

Blyvoor Gold Mine Project in South Africa

2020.09.03

Project Name:  Blyvoor Gold Mine Project

Location: South Africa

Mine: Gold ore

Capacity: 150 t/h

Main Equipment: JC1150 jaw crusher, CC300 cone crusher

About the Project

Blyvoor Gold Mine Project in South Africa is located in the large gold veins of the Witwatersrand Basin owned by DRDGOLD based in Johannesburg, South Africa. The gold veins consists of two main gold bearing layers, each with the thickness of 5 cm to 20 cm.

NMS cooperates with DRDGOLD provide the Project  with jaw crushers, cone crushers, vibrating screens and other main equipment. The Project development is normal on the whole and the capacity has achieved the expected level.

The project successfully completed the equipment debugging in July, 2020.

Previous:Old Castle (Rudus) Stone Project, Finland

Next:Wugang Chinada Mining Project